0

Your Cart is Empty

Sold out

Waqaf Motorised Borehole (Telaga Air) - Shared

Notify me when this product is available:

For Phase 3, we will commence the construction in September/October 2023 (once the funding is sufficient). Insya Allah.

Each Motorised Borehole costs $10,000 to construct (price increase due to the cost of construction materials and weak Nigerian currency).

  • Digging of borehole (70-90m)
  • Metal Tower x 1
  • Plastic Water Tank x 1
  • Diesel Portable Generator x 1
  • Water Basin with Tiles x 1
  • Water Pipes x 10
  • Color Signboard with Metal Stand (Names of Donors) x 1

You can waqaf as low as $10. We will close this waqaf once we hit $10,000.

We will not indicate any donors' names on the signboard. Instead we will indicate "Waqaf by Our Muslim Brothers & Sisters in Singapore".

The construction will commence once we achieve the $10,000 target. Insya Allah.

Once the project is completed and commissioned, we will share photos and video of this project on our fanpage. 

----------------------------------------------------

COMPLETED WATER PROJECT IN NIGERIA (PHASE 1)


----------------------------------------------------

COMPLETED WATER PROJECT IN NIGERIA (PHASE 2)

Videos : Click here to watch all the videos

Photos : Click on the link below

 Motorised @ Layin Bangis

 Motorised @ Layin Baban

 Motorised @ Layin Bursar

 Motorised @ Mangwarori Muchiya

 Handpump @ Yandaka

 Handpump @ Angwan Sarki

 Handpump @ Layin Idi Dan Kwakwa

 Handpump @ Angwan Kanawa

 Handpump @ Gidan Na Ruma

 Handpump @ Angwan Fulani

 Handpump @ Gidan Sarkin Dangi

❤ Handpump @ Gidan Alhaji Kangimi

----------------------------------------------------

Why is the cost of constructing the hand pump borehole higher than other countries in Asia?

This cost is determined by the cost of materials in Nigeria, the difficulty in transporting these materials into remote areas, and the heavy equipment needed to drill deeply (usually between 70m-90m), often through rocky soil.

Please refer to the photos to view the heavy-duty borehole drilling process that we did for our past projects.

Please refer to the photos to view the heavy-duty borehole drilling process that we did for our past projects.

Insya Allah we will accomplish this amanah with the assistance of our trusted partner in Nigeria, Isah Chikaji Foundation (ICF).

If you need any clarification, please contact us. Thank you :)


----------------------------------------------------

 

 

Sample of signboard that will be installed at the waqaf site.