Each Solar-Powered Borehole costs $8,000 to construct.
The construction will commence in August 2026 and will be completed by September 2026. Insya Allah.
Once the project is completed and commissioned, photos and certificates (softcopies) will be sent to you via WhatsApp, PM, or email (whichever is your preference) within 1-2 weeks.
----------------------------------------------------
COMPLETED WATER PROJECT IN NIGERIA (PHASE 1)
----------------------------------------------------
COMPLETED WATER PROJECT IN NIGERIA (PHASE 2)
Videos : Click here to watch all the videos
Photos : Click on the link below
❤ Motorised @ Mangwarori Muchiya
❤ Handpump @ Layin Idi Dan Kwakwa
❤ Handpump @ Gidan Sarkin Dangi
❤ Handpump @ Gidan Alhaji Kangimi
----------------------------------------------------
Why is the cost of constructing the hand pump borehole higher than other countries in Asia?
This cost is determined by the cost of materials in Nigeria, the difficulty in transporting these materials into remote areas, and the heavy equipment needed to drill deeply (usually between 60m-90m), often through rocky soil.
The project cost includes necessary administration, marketing, operational, and overhead expenses to ensure the project is implemented efficiently and sustainably.
Insya Allah we will accomplish this amanah with the assistance of our trusted partner in Nigeria, Isah Chikaji Foundation (ICF).
If you need any clarification, please contact us. Thank you.