Waqaf Hand Pump Borehole (Telaga Air)

or up to 3 interest-free payments of $116.67 with More info

For Phase 2, we will be constructing the waqaf hand pump borehole at 10 locations. Insya Allah.

Each Hand Pump Borehole costs $3,500 to construct.

  • Digging of Borehole (50-70m)
  • Metal Handpump x 1
  • Color Signboard with Metal Stand (Name of Donors) x 1

1 Hand Pump Borehole = 10 Waqaf Lot
1 Waqaf Lot = $350 (1 Donor's Name)

The constructions will commence in Aug 2022 and all are expected to be fully completed by June 2023. Insya Allah.

Once the project is completed and commissioned, photos and certificates (softcopies) will be sent to you by Whatsapp, PM, or email (whichever your preference) within 2-3 weeks.

----------------------------------------------------

COMPLETED WATER PROJECT IN NIGERIA (PHASE 1)


----------------------------------------------------

Sample of signboard that will be installed at the waqaf site.

 

Why is the cost of constructing the hand pump borehole higher than other countries in Asia?

This cost is determined by the cost of materials in Nigeria, the difficulty in transporting these materials into remote areas, and the heavy equipment needed to drill deeply (usually between 50m-70m), often through rocky soil.

Please refer to the photos to view the heavy-duty borehole drilling process that we did for our past project.

Below are projects that were done by OTHER organisations, which cost more than what we are able to offer:

 

Insya Allah we will accomplish this amanah with the assistance of our trusted partner in Nigeria, Isah Chikaji Foundation (ICF).

If you need any clarification, please contact us. Thank you :)